SOLAR

 

Continental US

Presidio Waste Water Treatment Plan, TX, 80 kW solar PV/battery, engineering & installation 2011

Southwest Plaza, CO, 700 kW solar PV, Standard RE: engineering completed 2008

Denver Human Services, CO, 30 kW solar PV, Standard RE: engineering, stamp, & installation 2008

Santa Teresa, NM, 5.0 MW solar PV, ICIS / IdeemaSun: feasibility and preliminary engineering 2008

 

 

Hawaii

24 Times Supermarket Stores on Oahu, Kauai and Maui

Shima’s Supermarket in Waimanalo

Waimea Canyon Shopping Plaza in Kekaha, Kauai

Kamehameha Shopping Center

Pacific Allied Products bottling plant- Campbell Industrial Park

Managed Projects

International Brother of Electrical Workers, CO, 2.4 kW wind: Golden Solar / IBEW: installed 2007

Cheyenne Botanic Gardens, WY, 1.0 kW solar-powered gazebo lighting: installed 2002

Habitat for Humanity, CO, (2) 2.0 kW solar PV systems: engineering & stamp 2007

Mercury Café, CO, 0.8 kW wind/3.1 kW solar hybrid: engineering, stamp, & installation 2005-2006

WIND

Windfarm Development:

    • Highland Park, CO, 80 MW, Clear Creek Power: resource assessment, permitting & plans underway
    • Colorado Star, CO, 100 MW, Arion Energy: resource assessment, permitting & plans underway
    • Combined Power, CO, 250 MW, HCRE: resource assessment and project plan 2010
    • Campbell Hill, WY, 99 MW, HTH Powershift / Duke Energy: complete and operating 2009
    • Chalk Mtn Wind, WY, 300 MW, Wind Revolutions: resource assessment and project plan 2009
    • Donbokri Wind, Jeju, Korea, 10 MW, Korenco RE: resource assessment and project plan 2009
    • Mesalands Community College, GE1.5sle R&D & Training Facility: complete and operating 2008
    • Bonneville Power Authority regional wind resource survey, Chinook / Energy NW: 2008
    • Iron Mountain, WY, 500 MW, Sytech / Terra-Gen: resource assessment and project plan 2008
    • Clipper C96 Technical Due Diligence, Chinook Wind / KeyBanc: complete 2007
    • Western US wind potential and optimization survey, Power Company of WY/Overland Trail, 2007
    • Peetz Table I, CO, 30 MW, enXco: planning and logistics, completed 2001, expanded 2007
    • 100-Windfarm Pre-Development Review, Chinook Wind / BP: complete 2006
    • San Clemente Island, CA, 900 kW Wind-Diesel Integration, NREL / US Navy: 1998-2002

Wind System Engineering and Installation:

  • Nederland High School, CO, 2.4 kW SkyStream wind turbine, engineering & installation 2011
  • Ponderosa High School, CO, 2.4 kW SkyStream wind turbine, engineering & installation 2010
  • Stratton High School, CO, 2.4 kW SkyStream wind turbine, engineering & installation 2009
  • Kit Carson High School, CO, 2.4 kW SkyStream wind turbine, engineering & installation 2009
  • National Wind Technology Center, CO, 2.4 kW SkyStream wind turbine, test tower & installation 2009
  • Thorne Ecological Institute, CO, 2.4 kW Skystream wind: engineering, stamp, & installation 2007
  • Stone Farms, CO, 3.0 kW Whisper wind-solar-propane hybrid: engineering & installation 2006-2007
  • Yearsley residence, CO, 2.4 kW Skystream wind: engineering, stamp, & installation 2008

Managed Projects

Wind Turbine Design:

  • Skystream Wind Turbine: GL certification & engineering, Southwest Windpower, Inc: 2010-11
  • Low Windspeed Turbine Project, Advanced Blade Pitch Control, NREL: 2003-2004
  • Advanced WT Next Generation, Z40, EW750, GE1.5 RD&D, Zond / Enron / GE Energy: 1993-2003
  • Wind Industry O&M Cost Analysis, NREL / Global Energy Concepts: 2001
  • Advanced WT Innovative Subsystems – Flexible Rotor RD&D, NREL / PS Enterprises: 1995-2001
  • Advanced WT Next Generation, TWC1.0, NREL / The Wind Turbine Co: 1999-2000
  • Near Term Research & Testing / Small WT Projects, Windeagle 25 & 300, Cannon Energy: 1997-1998
  • Advanced WT Innovative Subsystems – SCADA Fatigue Monitoring, SecondWind: 1994-1995
  • C-300 Germanischer-Lloyd Certification, Carter Wind Turbines: 1993-1994

 

BioGas